Region
Highlights
Routes
1 summit • 21.0 km • 1,406 m gain • 8 hr 6 min
Latest summits
"59th ultra prominent peak 🗻
19/100 日本百名山 🏔️ Nihon Hyaku-meizan
22/200 ⛰️ Nihayku-meizan
7 peak day! Misen -> Hakkyōgatake -> Myōjōgatake -> Bushyōgatake -> Kujakudake -> Shakagatake -> Dainichidake
Felt super fast going up the first two peaks. The trail along the ridge was quite treacherous by Japanese standards. The last peak was a 5.3 rhyolite face, but I used the metal cheater sling on the friction crux. I would feel very silly falling there with aid available. " — seancasserly • Apr 22, 2023
"This is the one I wanted to do most of all in my two years living in Japan. Took the West entrance of the tunnel and followed the river until we crossed a bridge. This was when the incline started. We walked up approximately 1km which took us onto a ridge. This part of the ridge was 1 km long to the bottom of Misen (1895 m). The path from Misen To Hakkyo-ga-take was 20 minutes which decreased before going up the other side to the top. A quick lunch break and retraced our steps." — steverd • Jul 27, 2007